Year | SIGNING AGENCY | CONTENT CONTRACT |
---|---|---|
2020 | Book and Educational Equipment South JSC |
Consulting Preliminary design and cost estimation for total preliminary investment
|
2019 | Ecopark Hai Duong Investment JSC |
Adjust the basic design of items outside the project boundary, bridge B1 and B2 bridge (Anh Duong bridge) and make estimate of adjustment of items outside the project boundary
|
2019 | Architect Studio (France) |
Compile total cost in basic design step for University of Science and Technology of Hanoi Development (New Model University) Project (USTH)
|
2018 | INGEROP Conseil et Ingénierie (France) |
Detailed planning and basic design for University of Science and Technology of Hanoi Development (New Model University) Project (USTH)
|
2018 | Gia Bao Architecture Planning JSC |
Consulting services to make proposals for investment of the Project: Restoration of Nhue River from pollution in the form of PPP
|
2013 | Giang Dong Investment Construction JSC |
Consultancy and verification of construction drawing design, cost estimate Bidding package: Consulting and verifying construction drawing design, cost estimate - cost estimate for West Thang Long road construction project from Pham Van Dong street to Van street Tien Dung is located in Bac Tu Liem District
|
2012 | SE Corporation (Japan) |
Review feasibility study report of Bach Dang bridge on Hai Phong – Ha Long Expressway
|
2008 | Thanh Hoa PMU |
Survey, feasibility study of Ma river's bridge, Yen Dinh, Vinh Loc, Thanh Hoa province
|
2008 | Center of Relic and Charm Conservation of Quang Tri Province |
Feasibility study for Ben Tat suspension bridge rehabilitation project, Quang Tri province
|