Research on method of stabilizing the slope of the leading road of Bai Chay Bridge
AuthorAdministrator19:46 - 09/02/2023
Works: Research on method of stabilizing the slope of the leading road of Bai Chay Bridge
Scale: L= 1.5km, including 10 drill holes
Location: Quang Ninh Province