Survey, Monitoring and Design of Slope Stability
AuthorAdministrator
Year SIGNING AGENCY CONTENT CONTRACT
2018 BOT Bien Cuong JSC
Survey, monitoring, slope stability design at km 27+950 under Halong - Van Don highway project in the form of BOT
2017 Kawasaki Geological Engineering Co., Ltd (Japan)
Design review, design calculation, drawings, quantity, cost estimation, bidding document, translation of Ground anchor market survey documents in Vietnam. Pilot project: strengthening slope No.7: Bai Chay bridge approach road/km117+500, NH18 under the project “survey on supporting private sector to popularize Japanese technologies for ground anchor construction method to prevent landslide on slope of road projects".
2017 Kawasaki Geological Engineering Co., Ltd (Japan)
Geological survey for NICHIAS factory - Phase V in Nomura Industrial Zone, An Duong district, Hai Phong city
2017 Kawasaki Geological Engineering Co., Ltd (Japan)
Geological survey for extended HLC store in Dinh Vu Industrial Zone, Hai Phong
2016 Power Engineering Consulting JSC 1
Consulting Service: assistance on assessment of the cause of the raising phenomenon of the intake and the safety stability of the dam” under Ban Ve Hydropower Plant Project
2014 The Japan International Cooperation Agency (JICA)
Monitoring equipment installation and geological survey work near Hai Van station landslide, Central Vietnam
2013 SE Corporation
Research on natural disaster in the North and Central of Vietnam
2013 ITST-JICA/JST Project Office
Consulting in the planning and supervision of monitoring equipment installation near Hai Van Station, Central Vietnam
2012 The Japan International Cooperation Agency (JICA)
The study on stabilization method for slope on approach roads of Bai Chay Bridge, Quang Ninh
2010 Kawasaki Geological Engineering Co., Ltd
Study, survey and assessment of landslide condition on NH4D, section Lao Cai - Sapa