Year | SIGNING AGENCY | CONTENT CONTRACT |
---|---|---|
2018 | BOT Bien Cuong JSC |
Survey, monitoring, slope stability design at km 27+950 under Halong - Van Don highway project in the form of BOT
|
2017 | Kawasaki Geological Engineering Co., Ltd (Japan) |
Design review, design calculation, drawings, quantity, cost estimation, bidding document, translation of Ground anchor market survey documents in Vietnam. Pilot project: strengthening slope No.7: Bai Chay bridge approach road/km117+500, NH18 under the project “survey on supporting private sector to popularize Japanese technologies for ground anchor construction method to prevent landslide on slope of road projects".
|
2017 | Kawasaki Geological Engineering Co., Ltd (Japan) |
Geological survey for NICHIAS factory - Phase V in Nomura Industrial Zone, An Duong district, Hai Phong city
|
2017 | Kawasaki Geological Engineering Co., Ltd (Japan) |
Geological survey for extended HLC store in Dinh Vu Industrial Zone, Hai Phong
|
2016 | Power Engineering Consulting JSC 1 |
Consulting Service: assistance on assessment of the cause of the raising phenomenon of the intake and the safety stability of the dam” under Ban Ve Hydropower Plant Project
|
2014 | The Japan International Cooperation Agency (JICA) |
Monitoring equipment installation and geological survey work near Hai Van station landslide, Central Vietnam
|
2013 | SE Corporation |
Research on natural disaster in the North and Central of Vietnam
|
2013 | ITST-JICA/JST Project Office |
Consulting in the planning and supervision of monitoring equipment installation near Hai Van Station, Central Vietnam
|
2012 | The Japan International Cooperation Agency (JICA) |
The study on stabilization method for slope on approach roads of Bai Chay Bridge, Quang Ninh
|
2010 | Kawasaki Geological Engineering Co., Ltd |
Study, survey and assessment of landslide condition on NH4D, section Lao Cai - Sapa
|
Survey, Monitoring and Design of Slope Stability
AuthorAdministrator23:48 - 08/02/2023